-
792.9 GWh Production
-
165,094 inhabitants Supplied with electricity
-
97 Wind turbines
-
308,438 tons of CO2 Avoided annually

Technical data
- TurbinesVestas V100/2MW
Spinning Spur 3 wind farm
at a glance
Located in Oldham County, TX. Commissioned in 2015 and has a PPA with City of Georgetown / City of Garland expiring in September 2035. This project includes 97 Vestas V100/2MW wind turbines. Boralex owns 50% of this site's interest. The total installed capacity of the site is 194 MW.
Follow our News in the US and Around the World
Our Projects and Sites in the US




