-
203.5 GWh Production
-
42,372 inhabitants Supplied with electricity
-
25 Wind turbines
-
70,208 tons of CO2 Avoided annually

Technical data
- TurbinesVestas V100
Milo wind farm
at a glance
Located in Roosevelt County, NM. Commissioned in 2016 and power sold merchant in SPP. This project includes 25 Vestas V100/2MW wind turbines. Boralex owns 50% of the site's interest. The total installed capacity of the site if 50 MW.
Follow our News in the US and Around the World
Our Projects and Sites in the US




