Skip to main content

Roosevelt Wind Roosevelt

Operational project

Location

Roosevelt , New Mexico, United States

Description

  • Commissioning dateDecember 2015
  • Contract duration20 years
  • Installed capacity250 MW
  • 1045.8 GWh Production

  • 217,751 inhabitants Supplied with electricity

  • 125 Wind turbines

  • 360,801 tons of CO2 Avoided annually

Technicienne souriante sur le toit d'une éolienne levant les mains au ciel

Technical data

  • Turbines Vestas V100/2MW

About Boralex

All you need to know about Boralex's activity worldwide.

Explore

Technicien souriant
Limekiln Wind Farm turbine close-up, Scotland

Roosevelt wind farm
at a glance

Located in Roosevelt County, NM. Commissioned in 2015 and has a PPA with Southwest Public Service Co. expiring in December 2035. This project includes 125 Vestas V100/2MW wind turbines. Boralex owns 50% of the site's interest. The total installed capacity of the site if 250 MW.