Chasse-Marée Repowering Fressenneville

Project in development

Location

Fressenneville , Somme, France

Description

  • Commissioning dateJuly 2035
  • Installed capacity23,6
  • 25 000* inhabitants Supplied with electricity

  • 4 Wind turbines

  • 2 100* tons of CO2 Avoided annually

chasse_maree_g0211731.jpg

Technical data

  • Rotor diameter150 m
  • Platform height105 m
  • Blade size75 m

About Boralex

All you need to know about Boralex's activity worldwide.

Explore

Technicien souriant

Project details

Chasse-Marée wind farm has been commissioned in 2010, it has been contributing to renewable energy production in the Vimeu Community of Communes for more than 15 years.

In anticipation of technical obsolescence, the wind farm is currently undergoing a renewal project aimed at modernizing the facilities with more efficient wind turbines that are better integrated into their surroundings. This project will increase renewable energy production while maintaining the current number of wind turbines at the site. We will therefore replace 4 wind turbines with 4 new ones.

The site selection for the Chasse-Marée wind farm renewal project takes into account numerous technical criteria, such as transportation routes and electrical, gas, and water infrastructure. Criteria related to biodiversity, landscape, heritage, aviation, and telecommunications are also considered. The wind farm renewal project complies with the regulatory distance of 500 meters from residential areas.

Implantation projet de renouvellement de Chasse Marée

The same number of turbines after the upgrade,
that is, 4 wind turbines

Before 9,2 MW
After 23,6 MW

Installed capacity

Before 8 500
After 31 500

Residents supplied with electricity annually

Before 800
After 2 600

Tons of CO2 avoided annually

Before 119m
After 180m

Total height of wind turbines

Before 41m
After 75m

Blade length

Before 84m
After 105m

Platform height

 Boralex's first wind farm expansion in France and worldwide: discover the Cham Longe wind farm

Cham Longe is the highest wind farm in France (1,457 meters above sea level). Commissioned in 2005 along a ridge in the Montagne Ardéchoise, its spectacular setting exposes it to a harsh climate and strong winds. In 2020, Boralex decided to optimize the wind farm by dismantling 12 of its 14 turbines and replacing them with an equal number of turbines better suited to the site’s environment.

This project marks Boralex’s first wind farm retrofit in France—and worldwide! Watch the video to learn more.

 

A question on wind energy ? 

Contact our team

Parc éolien d'Ally-Mercoeur en France exploité par Boralex

*Sources for France : ADEME, CRE, and RTE. Consumption per inhabitant: Average consumption across all uses