  • Commissioning dateJanuary 2023
  • Installed capacity25 MW
  • Around 27,900* inhabitants Supplied with electricity

  • 6 Wind turbines

  • Around 2,500* tons of CO2 Avoided annually

Techniciens et techniciennes face à une éolienne

Technical data

  • Rotor diameter136 m
  • Platform height180 m

About Boralex

All you need to know about Boralex's activity worldwide.

Explore

Technicien souriant

The Mont de Bézard Wind Farm in Detail

Located between the Marne and Aube departments, in the municipalities of Gourgançon and Semoine, the Mont de Bézard wind farm hosted until 2022 six turbines with a unit capacity of 2 MW. Commissioned in 2007, the wind farm underwent a repowering project to replace the existing equipment with the same number of turbines, each with a unit capacity of 4.2 MW. The new configuration enables the production of electricity equivalent to the consumption of more than 20,000 households and helps avoid approximately 14,000 tonnes of CO₂ emissions.

 

A question on wind energy ? 

Contact our team

Parc éolien d'Ally-Mercoeur en France exploité par Boralex

Follow our News in France and Around the World

*Sources for France : ADEME, CRE, and RTE. Consumption per inhabitant: Average consumption across all uses