70 MW Production
About the Limekiln Battery Energy Storage System (BESS) Project
The site is located on the Limekiln Estate, just south of Reay, Caithness in the Highlands of Scotland. The site is part of the operational Limekiln Wind Farm and is located on what was one of the construction compounds within the site. It is anticipated that the BESS compound area will be approximately 1.5 hectares, and the Substation extension will be approximately 0.5 hectares.
Battery Energy Storage Systems (BESS) play a vital role in ensuring a stable, reliable, and sustainable energy system. They store excess electricity when demand is low and release it back into the grid when needed. In turn this reduces our reliance on fossil fuels and so supports our country’s transition to clean energy.
A question about our activity in the UK ?
Latest News
Documents
Limekiln BESS Project Overview
Why this Location?
- The Proposed Development will be well screened by surrounding forestry so will have minimal landscape and visual impact.
- Minimal disturbance to undisturbed ground by using the reinstated temporary compound area and permanent onsite tracks for Limekiln Wind Farm.
- The proposed location of the temporary construction compound was not identified as a priority habitat for the Wind Farm application so minimal environmental impact is predicted.
- The proposed location of the temporary construction compound has not yet been replanted with trees as part of the forestry plan for the Wind Farm.