Skip to main content

Saint-Lambert Saint-Lambert

Operational project

Location

Saint-Lambert, Quebec, Canada

Description

  • Commissioning dateJanuary 1995
  • Contract duration25 years
  • Installed capacity5,8 MW
  • 36.5 GWh Production

Générique Hydro - Banner Hydro

Technical data

  • Flow175 m³/s
  • Head5 m
  • FacilityRun of the river
  • RiverSaint-Laurent
The referenced media source is missing and needs to be re-embedded.

About Boralex

All you need to know about Boralex's activity worldwide.

Explore

Technicien souriant

Saint-Lambert hydroelectric power plant
at a glance

Located near the Saint-Lambert locks, close to the Saint Lawrence River, the Saint-Lambert power plant was built in 1993 and commissioned in 1995. It produces 6 MW of hydroelectricity.