Skip to main content

Haut de Conge Poinson lés Nogent, Vitry-lès-Nogent, Dampierre

Operational project

Location

Poinson lés Nogent, Vitry-lès-Nogent, Dampierre, Haute-Marne, France

Description

  • Commissioning dateJanuary 2010
  • Installed capacity28.7 MW
  • Around 18,400* inhabitants Supplied with electricity

  • Around 1,900* tons of CO2 Avoided annually

Techniciens et techniciennes face à une éolienne

Technical data

  • Rotor speed8 to 15 rpm
  • Rotor diameter92 m
  • Platform height93 m

About Boralex

All you need to know about Boralex's activity worldwide.

Explore

Technicien souriant

About the Haut de Conge Wind Farm

The Haut de Conge wind farm is located across the municipalities of Poinson-lès-Nogent, Vitry-lès-Nogent, and Dampierre, in the Haute-Marne department (52). Commissioned in 2010, it consists of 14 wind turbines with a total installed capacity of 28.7 MW.

This site produces the equivalent of the annual electricity consumption of 18,400* residents. Thanks to this installation, nearly 1,900* tonnes of CO₂ emissions are avoided each year. This project is fully aligned with Boralex’s strategy to accelerate the energy transition across the region.

Technicien éolien Boralex en France

 

A question on wind energy ? 

Contact our team

Parc éolien d'Ally-Mercoeur en France exploité par Boralex

Follow our News in France and Around the World

*Sources for France : ADEME, CRE, and RTE. Consumption per inhabitant: Average consumption across all uses