Around 18,400* inhabitants Supplied with electricity
-
Around 1,900* tons of CO2 Avoided annually

Technical data
- Rotor speed8 to 15 rpm
- Rotor diameter92 m
- Platform height93 m
About the Haut de Conge Wind Farm
The Haut de Conge wind farm is located across the municipalities of Poinson-lès-Nogent, Vitry-lès-Nogent, and Dampierre, in the Haute-Marne department (52). Commissioned in 2010, it consists of 14 wind turbines with a total installed capacity of 28.7 MW.
This site produces the equivalent of the annual electricity consumption of 18,400* residents. Thanks to this installation, nearly 1,900* tonnes of CO₂ emissions are avoided each year. This project is fully aligned with Boralex’s strategy to accelerate the energy transition across the region.