Skip to main content

Zondrange Fouligny, Bionville-sur-Nied, Marange-Zondrange

Operational project

Location

Fouligny, Bionville-sur-Nied, Marange-Zondrange, Moselle, France

Description

  • Commissioning dateDecember 2016
  • Installed capacity12.5 MW
  • Around 9,800* inhabitants Supplied with electricity

  • 4 Wind turbines

  • Around 960* of CO2 Avoided annually

Techniciens et techniciennes face à une éolienne

Technical data

  • TurbinesNordex N100
  • Rotor diameter100 m
  • Platform height100 m

About Boralex

All you need to know about Boralex's activity worldwide.

Explore

Technicien souriant

About the Zondrange Wind Farm

Located in Moselle, the Zondrange wind farm consists of 5 turbines, each with a capacity of 12.5 MW. Commissioned in 2016, it generates an annual output equivalent to the electricity consumption of 9,800* residents.

This project contributes to reducing CO₂ emissions, with approximately 960* tonnes avoided each year, and plays a concrete role in the development of renewable energy in France.

Follow our News in France and Around the World

 

A question on wind energy ? 

Contact our team

Parc éolien d'Ally-Mercoeur en France exploité par Boralex