Repowering Sources de la Loire Saint-Cirgues-en-Montagne

Project in development

Location

Saint-Cirgues-en-Montagne , Ardèche, France

Description

  • Commissioning dateJanuary 2031
  • Contract durationCRE call for tenders
  • Installed capacityBetween 24 MW and 28 MW
  • 34 600 inhabitants Supplied with electricity

  • 6 Wind turbines

  • 2 900 tons of CO2 Avoided annually

Eolienne sur une colline

Technical data

  • Rotor speed11 rpm
  • Rotor diameterBetween 133 and 138 m
  • Platform heightBetween 110 and 112 m
  • Blade sizeBetween 66 and 69 m

About Boralex

All you need to know about Boralex's activity worldwide.

Explore

Technicien souriant

The project in details 

The repowering project for the Saint-Cirgues-en-Montagne wind farm was initiated in 2022, with the objective of optimizing a site already dedicated to renewable energy production, consisting of 9 wind turbines.

Environmental surveys were carried out throughout 2023 to cover a complete biological cycle (fauna, flora, natural habitats, birdlife, and bats).

At the end of 2024, the municipality of Saint-Cirgues-en-Montagne formally approved the classification of the project area as a Renewable Energy Acceleration Zone (ZAENR), confirming its alignment with the region’s energy transition strategy.

This project aims to replace the existing turbines with 6 wind turbines—fewer but more efficient machines—thus increasing renewable electricity production while controlling environmental impacts.

Photo du parc des Sources de la Loire

Sources de la Loire Repowering Project stakeholders 

The project involves several stakeholders, including:

  • The municipality of Saint-Cirgues-en-Montagne, which is kept informed of the major stages of the project
  • Landowners and farmers affected by the installation of wind turbines
  • Government agencies
  • Local residents
  • Specialized consulting firms (environment, acoustics, landscape, hazard studies, hydrogeological studies
  • The project developer Boralex, responsible for the project from start to finish: from design to operation of the wind farm

Consulting firms are involved at each key stage: conducting naturalist inventories, environmental impact studies, landscape studies, acoustic studies, technical design, and regulatory monitoring.

 

A question on wind energy ? 

Contact our team

Parc éolien d'Ally-Mercoeur en France exploité par Boralex

Follow our News in France and Around the World

*Sources in France: ADEME, CRE and RTE_Consommation