61.3 GWh Production
-
12,418 inhabitants Supplied with electricity
-
9 Wind turbines
-
80 tons of CO2 Avoided annually

Technical data
- TurbinesEnercon E-92
- Rotor diameter92 m
- Platform height85 m
- Blade size43.8 m
Site overview
The Le Plateau 2 community wind farm is located on unorganized territory of Ruisseau-Ferguson in Avignon MRC, in Québec’s Gaspésie region. It is owned by the Régie intermunicipale de l’énergie Gaspésie-Iles-de-la-Madeleine (40%) and by Boralex (60%).
The farm operates 9 Enercon E‑92 wind turbines and has a 20‑year power supply contract with Hydro-Québec, awarded after a call for tenders, in 2009, to deliver 500 MW of wind power.
The project partners
- Régie intermunicipale de l’énergie Gaspésie-Iles-de-la-Madeleine : 40 % of parts
- Boralex : 60 % of parts