Port Ryerse
Wind Site
Equivalence in tons of CO2 avoided annually | 1,160 |
Location: | Smithville |
Commission Date: | 2016 |
Contract: | 20 years (2016-2036) with Independent Electricity System Operator (IESO) |
Country: | Canada |
Power: | 10 MW |
Province: | Ontario |
Status: | In operation |
Project Documents
Community Liaison Committee
Post-Construction Surveys
- 2022 Bat Mortality Monitoring
- 2021 Bat Mortality Monitoring
- 2020 Bat Mortality Monitoring
- 2019 Significant Wildlife Habitat Monitoring
- 2019 Bird & Bat Monitoring
- 2018 Significant Wildlife Habitat Fact Sheet
- Port Ryerse Wind Farm 2018 Bird and Bat Mortality Monitoring
- Amendment to Renewable Energy Approval
- 1st Acoustic Immission Audit
- 2017 Significant Wildlife Habitat Fact Sheet
- Port Ryerse Wind Farm 2017 Bird & Bat Mortality Monitoring
- Acoustic Emmission Audit
- Turbine T2 - International Standard IEC 61400-11 Edition 3.0 Measurement Report - “Wind turbine generator systems – Part 11: Acoustic noise measurement techniques”
- Turbine T4 - International Standard IEC 61400-11 Edition 3.0 Measurement Report - “Wind turbine generator systems – Part 11: Acoustic noise measurement techniques”
- Bald Eagle Winter Perching Habitat Survey Results - 2013
- Construction Plan report
- Consultation report - Aboriginal consultation
- Consultation report - Public, agency and municipal consultation
- Decommissioning plan report
- Design and Operations report
- Heritage assessment report
- Ministry of Natural Resources NHA Re-Confirmation Letter
- Natural heritage assessment and environmental impact study
- Natural Heritage Assessment Addendum
- Noise Assessment Report - Revision 6
- Port Ryerse Wind Farm - Sound Power Level Map¹
- Pre-Construction Evaluation of Significance Surveys for Landbird Migratory Stopover Area LBMS01 - 2012-2013
- Project description report
- Project summary report
- Renewable Energy Approval
- Revised Appendix D - Staff Summaries - Port Ryerse Wind Power Project - Natural Heritage Assessment & Environmental Impact Statement
- Stage 1 Archaeological Assessment Report
- Stage 2-3 Archaeological Assessments report
- Water assessment and water body report
- Wind turbine specifications report