Wind, hydroelectric, solar and thermal projects | Boralex

Wind

Pays d'Othe

Pays d'Othe is a joint venture between Boralex and JP Énergie Environnement (JPEE). Its 4 turbines, totaling an installed capacity of 8 MW, were commissioned in October 2014, and the site was inaugurated the next summer. It is located in the Yonne departement (Burgundy, France), on the communes of Vaudeurs, Coulours and Les Sièges.

Wind
In operation
POWER 8 MW
Turbines 4 Vestas V90
Rotor speed Between 9 and 16/rpm
Nacelle height 105 m
Commissionning October 2014
Equivalence in homes supplied with electricity annually 2,592 homes
Equivalence in tons of CO2 avoided annually 1,153 tons of CO2

¹ International Energy Agency (IEA) 2013