Wind, hydroelectric, solar and thermal projects | Boralex

Wind

Haut de Conge

The Haut de Conge wind farm was commissioned in August 2010. It includes 14 turbines and il located between the cities of Poinson-lès-Nogent, Vitry-lès-Nogent and Dampierre, in the Champagne-Ardenne region, for a total installed capacity of 28 MW.

Wind
In operation

Contact

info@boralex.com

POWER 28 MW
Turbines 14 Repower MM92
Rotor speed 8 to 15/rpm
Rotor diameter 92 m
Nacelle height 93 m
Blades length 47 m
Client Électricité de France
Commissionning August 2010
Equivalence in homes supplied with electricity annually 7,145 homes
Equivalence in tons of CO2 avoided annually 3,178 tons of CO2

¹ International Energy Agency (IEA) 2013