Wind, hydroelectric, solar and thermal projects | Boralex

Chépy wind farm includes 2 turbines totalling 4 MW of installed capacity. The project was commissioned in October, 2003, and is located in France's Picardie region. It is coverded by a 15-year power purchase agreement with Électricité de France (EDF), from 2003 to 2018. 

Wind
In operation
POWER 4 MW
Turbines 2 Enercon E66
Rotor speed 22.5/rpm
Rotor diameter 66 m
Nacelle height 65 m
Blades length 33 m
Weight per turbine 240 t
Commissionning October 2003
Equivalence in homes supplied with electricity annually1 878 homes
Equivalence in tons of CO2 avoided annually1 390 tons of CO2

¹ International Energy Agency (IEA) 2013

Documentation