Wind, hydroelectric, solar and thermal projects | Boralex

Located in the Nord departement (France), on the municipalitiy of Catillon-sur-Sambre and Bazuel, the Catésis wind farm is composed of 5 wind turbines of 2 MW each. The site will be commissioned in April 2019.

Wind
Construction
POWER 10 MW
TURBINES Vestas V100
ROTOR DIAMETER 150 m
NACELLE HEIGHT 100 m
BLADES LENGTH 50 m
COMMISSIONING April 2019

News

Wind Farm under construction.