Wind, hydroelectric, solar and thermal projects | Boralex

Located in the Nord departement (France), on the municipalitiy of Catillon-sur-Sambre and Bazuel, the Catésis wind farm  is composed of 5 wind turbines of 2 MW each. 

Wind
In operation
POWER 10 MW
TURBINES Vestas V100
ROTOR DIAMETER 150 m
NACELLE HEIGHT 100 m
BLADES LENGTH 50 m
Commercial Operation Date June 2019
EQUIVALENCE IN TONS OF CO2 AVOIDED ANNUALLY* 2,500

*Based on calculations and assumptions made by the Chair in Energy Sector Management at HEC Montréal.